-
The U.S. Army Corp of Engineers says the delays are associated with the MacArthur lock's age and the complexities of navigating tight spaces with large components.
-
With the MacArthur lock still under repair, the only functioning lock, the Poe lock, is under added pressure. Ships are being delayed up to 90 minutes.
-
The nearly $1.1 billion project is projected to cost nearly three times the original amount.
-
The Army Corps of Engineers is moving ahead with plans to construct a new lock in Sault Ste. Marie, Michigan after receiving full funding from the passage of the federal bipartisan infrastructure act.
-
The Soo Locks opened Wednesday, marking the start of the 2021 Great Lakes shipping season, however this year, they are opening earlier than normal.Usually…
-
The Soo Locks are one of the engineering marvels of the world, creating a vital link for commerce between Lakes Superior and Huron, in Sault Ste.…
-
The Soo Locks came to a halt on Monday, as the large Poe Lock was shut down the Poe Lock to complete emergency repairs. 86% of all traffic that passes…
-
Seven thousand ships pass through the Soo Locks each year carrying more than eighty millions pounds of cargo. Whether it is small recreational boats or…
-
The Soo Locks opened Monday and the 2019 shipping season has officially begun. The first ship passed through the Soo Locks at 12:01 on Monday morning. The…
-
The Soo Locks closed for the winter on Tuesday and are expected to undergo several million dollars in repairs.The locks are shut down every year between…