-
If signed into law, the federal funding would cover the project costs for the 2025 fiscal year. So far, $1.97 billion has already gone into the project.
-
The Soo Locks came to a halt on Monday, as the large Poe Lock was shut down the Poe Lock to complete emergency repairs. 86% of all traffic that passes…